50.4 MW Wind Farm with a 20 MW / 80 MWh Battery Energy Storage System

Sumber Soum, Govisumber Province

Client: Wind Farm Choir LLC
Operator: Wind Farm Choir LLC
Connection Point: 220/110/35 kV Choir Substation
Project location: Sumber Soum, Govisumber Province
Project Timeline: 2025–2027